Construction of a BRC fence
Our company implemented and equipped the construction of a BRC fence for Anton Oil CO.

DRILLING ARTESIAN WELLS TO ENI CO. IN BARJISIYA

•Construction of cathodic protection rooms in Majnoon field



PIPELINE PROJECT BETWEEN YAMAHA OIL FIELD AND FIELD STATION
1-Installing the sacrificial anodes for cathodic protection


2-Install and connect Rectifier, Cathodic, and Anodic junction boxes and also permanent MMO anodes.

3-Install and connect Field Instruments and Actuators for Launcher and Receiver Skids.
4-Install and connect SCADA and Control System and emergency shutdown systems.

5-Extending and linking the Fiber Optic cable between Al Yamamah and Al Hagliyah stations.

6-Extending and linking the optical cable under Shatt Al-Arab using Dura line and Blowing techniques inside 4 HDD tube



Electricity maintenance work inside ENI CO. In Al-Barjisiya.

Transfer of equipment from the port of Khor Al Zubair to the BNGL gas site in Northen Rumaila Contract with Marlog CO.



Equipping the companies operating in the port of Faw mechanisms and materials.

Transportation with the Turkish Al-Masnak Company from Umm Qasr port to the Majnoon oil field.

Transfer of materials from the port of Khor Al Zubair to Rumaila oil field for the German company Marlog.

Other completed projects
1-Constructing the building of the Nationality in Zubair for the account of Al-Dar Contracts Company.
2-Constructing 10 houses in Waha’a Al-Qae’ed for the account of Al-Dar
Contracts Company.
3-Water Network Project for Al-Oa’ed Q. for the account of Al-Dar
Contracts Company.
4-Project of Wafa’a Al-Qa’ed pumping station for the account of Al-Dar
Contracts Company.
5-Constructing District Governor at Zubair for the account of Al-Dar
Contracts Company.
6-Rehabilitation works for Al-Muhalab Bin Safrah School for the account ” of BECTHTEL Co.
7-Rehabilitating works for Al-Saraji School for girls for the account of
BECHTEL Co.
8-Constructing (15) trusses in the precast houses in Northern Rumaila for the account of South Oil Co.
9-Rehabilitation works for two workshops of deletion and receiving At Bab.
10-Rehabilitation works for Al-Ahlam Nursery House in Al-Abilah.
11-the account of Save the Children Organization.
12-Rehabilitation and installing electrical towers from Zubair to Tuba cooperating with Basrah Electrical Projects Department
13-Rehabilitated of the Rumaila School.
14-Contract no.124/TZ/2011 Driling Artesian Wells with lining at Italian
Camp (ENI).
15-Construction of electrical and mechanical Gasd the oil Station in the west of Al-Qurna.
16-Constructed of the communication building at the gas station in the West of Al-Qurna.
17-Constructed of the electricity transfers building at Northen Rumaila.
18-Project of Wafa’a Al-Qaed pumping station for the account of Al-Dar
Contracts Company.
19-Constructed of fence around the oilstations at Al-Lehas and Al-Rumaila
Contracts Company.
20-Castled oil pumps bottoms (reinforced concrete) and othesfer boilers and fire extinguishers at the oil regions.
21-Rehabilitating works for Al-Saraji School for girls for the account of
BECHTEL CO.
22-Constructed & Rehabilitation of stations at Artawi Field.
23-Constructed of Fuel – stations in Al-Rumaila.
24-Contract no. 149/B/2007 (Sewerage pipelining works at Bab Az- Zubair).
25-Contract no. 3 4 5/B/2008 cutting & removal Place of two depots ceiling no.1 at third Degassing Station & no. 1 at Luhals Degassing Station.
26-Contract no. 38/TZ/2011 consented concrete yard for erection
Department at Barjeslyah & varled works.
27-Contract no. 61/TZ/2011 Earthing works for Wet Oil Unit at Hammar
Degassing Station.